Building Provisions

Amenities & Building Provisions

What every Harrison Food Factory unit includes — and the shared provisions that make the building production-ready: sky terrace, canteen, full ramp, exhaust ducts and grease traps.

Harrison Food Building shared facilities and provisions
Production-ready shared provisions
Per-unit provisions

What every unit comes with.

Each unit at Harrison Food Building is specified for food production from day one, reducing costly retrofit:

  • Own toilet provision (supports SFA food-handling rules)
  • Grease trap sized for food-factory throughput
  • Kitchen Exhaust Duct (KED) routed to roof
  • Refuse chute to a central waste system
  • Three-phase power scaled by level
  • 12.5 kN/m² live load for heavy equipment

See the floor plans for how these fit a bakery, kitchen or sauce-and-paste setup.

Shared amenities

Beyond the unit envelope.

Level 4 sky terrace

Landscaped staff respite area for breaks and informal meetings.

Level 1 canteen

A 318 sqm industrial canteen (#01-01) — staff dining solved on-site.

Full vehicular ramp

Lorries reach every floor, L1–L8, with Level 1 loading bays.

Cargo & passenger lifts

Sized for goods movement alongside the drive-up ramp.

Waste management

Central refuse handling built to food-grade hygiene standards.

Sustainability

Energy-conscious building services and landscaping provisions.

View Site Plan Balance Units

Speak with our sales team

Ready to discuss your unit?

Call our project consultant for the latest balance-unit chart, indicative pricing and an appointment at the sales gallery.

Call Sales